Load & weight bearing
Load and weight bearing information
Central Hall
Floor loading is given as 300 Ibs./sq.ft
Point load of 7 tonnes are permissible 3m apart or at 2m distance from other distributed loads.
Roof loads of 4 tonnes per arch (No’s 3–9 &14–16) uniform.
Roof loads of 10 tonnes per arch (No’s 10–13) uniform.
Exchange Hall
Floor loading is given as 10 kilonewtons/m².
Roof loads of 3 tonne per beam uniform.
- Vehicles up to 40 tonnes gross weight are permitted in the halls.
- All documentation to support evidence of Loads and movements must be verified in writing to Event Management for discussion and approval.