skip to main content

Load & weight bearing

Load and weight bearing information

Central Hall

Floor loading is given as 300 Ibs./sq.ft

Point load of 7 tonnes are permissible 3m apart or at 2m distance from other distributed loads.

Roof loads of 4 tonnes per arch (No’s 3–9 &14–16) uniform.

Roof loads of 10 tonnes per arch (No’s 10–13) uniform.

Exchange Hall

Floor loading is given as 10 kilonewtons/m².

Roof loads of 3 tonne per beam uniform.

  • Vehicles up to 40 tonnes gross weight are permitted in the halls.
  • All documentation to support evidence of Loads and movements must be verified in writing to Event Management for discussion and approval.